References
Reference letters from clients for whom we have completed wastewater treatment installations.
Our company purchased a new pre-treatment plant with a capacity of 50 m3/h for treating wastewater from film recycling. Marex Technology delivered on time, carried out the commissioning efficiently, and trained our staff in operation and maintenance, showing a high level of professionalism and reliability.
Our plant operates a PST 2×300 and 2×200 screw press at the wastewater treatment plant. The impeccable stainless steel construction ensures trouble-free operation, and the practical design makes the press straightforward to use. Operational experience confirms that it fully meets our expectations.
I confirm that Marex Technology supplied and installed equipment for a pre-treatment plant with a capacity of 50 m3/h. The equipment was selected after a thorough analysis of 5 different offers. Operating experience to date confirms the high build quality, and the technical solutions applied ensure reliable, trouble-free performance.
Facilities in Poland and abroad run day to day under our care.
Let's talk about your project.
Fill in a short form and we'll get back to you with an answer and a proposal for next steps. We'll help you select the right technology and guide you through the entire process.
- Phone+48 24 276 13 80
- E-mailsekretariat@marextechnology.com
- Production facilityul. Płońska 10, 09-210 Drobin