Our projects
Wastewater treatment installations in Poland and abroad, from industry to municipalities, under our ongoing care.
Installations that work every day.
We design and build complete wastewater treatment systems in Poland and abroad.

Wastewater treatment plant at a cattle slaughterhouse in Biskupiec
Marex Technology supplied and installed the wastewater treatment plant at a cattle slaughterhouse in Biskupiec. The plant treats up to 400 m3/day of wastewater from the site's production.

Construction and modernisation of water and sewerage infrastructure in Brudzeń Duży Municipality
Marex Technology was the main contractor for the construction and modernisation of the water supply and sewerage network in Brudzeń Duży Municipality. New network sections and upgraded facilities gave residents a more reliable water supply and a connection to the central sewerage system.

Budva Municipal Wastewater Treatment Plant, Montenegro
Wastewater mixing and sludge aeration process line

Municipal wastewater treatment plant in Gozdowo
A project delivered by Marex Technology as the main contractor on a turnkey basis, with full responsibility for the construction of the entire facility.

Woroniec
Chemical-biological wastewater treatment plant, capacity 600 m3/day

Agro-Top Sp. z o.o.
Sludge dewatering installation, capacity 6 m3/h

Wipasz S.A. Wastewater Treatment Plant in Międzyrzec Podlaski

Perutnina Ptuj

Municipal Wastewater Treatment Plant in Białobrzegi
Sludge dewatering station at the wastewater treatment plant in Białobrzegi.

EvraFish Sp. z o.o.
Construction of a mechanical-chemical pre-treatment plant discharging pre-treated wastewater into the municipal sewer system in Brusy

Municipal wastewater treatment plant in Wieluń
Supply of a sludge dewatering system based on a press 132 with a capacity of 2 m3/h

Wastewater Treatment Plant in Kozienice
Extension of the sludge dewatering and hygienisation station building SOHO

PKN Orlen S.A.
Mechanical and chemical pre-treatment plant with a capacity of 30 m3/h

Wipasz S.A.
Sludge dewatering installation, capacity 8 m3/h, and supply of a belt filter, capacity 120 m3/h

SuperDrob S.A.
Mechanical and chemical pre-treatment plant, capacity 20 m3/h (Stoczek facility). Mechanical and chemical pre-treatment plant, capacity 150 m3/h
Let's talk about your project.
Fill in a short form and we'll get back to you with an answer and a proposal for next steps. We'll help you choose the right technology and guide you through the entire process.
- Phone+48 24 276 13 80
- E-mailsekretariat@marextechnology.com
- Production facilityul. Płońska 10, 09-210 Drobin